📢 جديد: تابع عروض اليوم على قناتنا في واتساب
Jobiglo

لا توجد نتائج.

Data Center Construction Director (MEP)

NAFFCO · Dubai

جديد
Senior 🇬🇧 English
MEP UPS BMS EPMS ELV FAT SAT IST Commissioning

وصف الوظيفة

About the role

NAFFCO is seeking an accomplished Data Center Construction Director to lead the end-to-end construction and delivery of large-scale data center and critical infrastructure projects across the GCC. The role is hands-on construction leadership, covering greenfield and brownfield projects, and requires a strong background in MEP infrastructure and modular data center deployment.

Key responsibilities

  • Lead greenfield and brownfield data center projects from mobilisation through completion and handover.
  • Oversee civil, structural, architectural and MEP construction activities.
  • Manage critical electrical and mechanical infrastructure, including UPS, generators, transformers, switchgear, chillers and cooling systems.
  • Ensure integration of BMS, EPMS, EMS, ELV and fire protection systems.
  • Lead modular and prefabricated data center construction, including factory-integrated MEP modules and containerised facilities.
  • Manage EPC contractors, subcontractors, consultants, suppliers and multidisciplinary project teams.
  • Drive project planning, budgets, cost control, quality, HSE and construction schedules.
  • Lead FAT, SAT, Integrated Systems Testing (IST), commissioning and final operational handover.
  • Ensure redundancy, resilience and failover configurations meet project requirements.

Required profile

  • Bachelor's degree in Civil, Mechanical or Electrical Engineering; Electrical or Mechanical preferred.
  • 15-20 years of overall construction industry experience, with at least 8-10 years directly in data center construction.
  • Proven track record of personally delivering complete, operational data center projects.
  • Experience working with main contractors or EPC contractors; GCC project experience highly desirable.
  • Candidates with purely IT infrastructure, data center operations or design-only backgrounds will not be considered.

Required skills

  • Strong expertise in critical MEP infrastructure and mission-critical building services.
  • Practical exposure to modular and prefabricated data center construction.
  • Project leadership, commercial management, planning and execution capabilities.

Questions fréquentes

Le salaire n'est pas communiqué publiquement par le recruteur. Vous pouvez postuler et négocier directement avec NAFFCO.
Cliquez sur "Postuler maintenant" en haut de la page. Vous pouvez importer votre CV en 1 clic — Jobiglo extrait automatiquement vos informations et postule pour vous.
Source : ats:teamtailor

لماذا تبلغ عن هذا العرض؟

شكراً لإبلاغك. سنراجع هذا العرض.

اكتشف المزيد

الرواتب والأدلة وعمليات البحث في الإمارات العربية المتحدة.

قدم طلبك في 30 ثانية

أدخل بريدك الإلكتروني للتقديم. سيتم إنشاء حساب تلقائياً.

قدم الآن →

بالمتابعة، أنت توافق على شروط الاستخدام.

لديك حساب بالفعل؟ تسجيل الدخول

لديك سؤال حول هذا العرض؟

اطرحه هنا: ستصلك تفاصيل العرض كاملة عبر البريد الإلكتروني، فوراً.

منشور منذ 7 ساعات

ينتهي شهر من الآن

20 مشاهدات · 0 مهتم

عزز فرصك

حمّل سيرتك الذاتية وسنقترح عليك الوظائف التي تناسب ملفك.

جاري تحليل سيرتك الذاتية...

NAFFCO

Dubai