Data Center Construction Director (MEP)
NAFFCO Careers · Doubaï
وصف الوظيفة
About the role
An accomplished Data Center Construction Director is sought to lead the end-to-end construction and delivery of large-scale data center and critical infrastructure projects across the GCC. The successful candidate brings extensive experience in construction management, critical MEP infrastructure, modular data center deployment and commissioning, with a proven track record of delivering fully operational data center facilities. This is a hands-on construction leadership position.
Key responsibilities
- Lead greenfield and brownfield data center projects from mobilisation through completion and handover.
- Oversee civil, structural, architectural and MEP construction activities.
- Manage critical electrical and mechanical infrastructure, including UPS, generators, transformers, switchgear, chillers and cooling systems.
- Ensure integration of BMS, EPMS, EMS, ELV and fire protection systems.
- Lead modular and prefabricated data center construction, including factory-integrated MEP modules and containerised facilities.
- Manage EPC contractors, subcontractors, consultants, suppliers and multidisciplinary project teams.
- Drive project planning, budgets, cost control, quality, HSE and construction schedules.
- Lead FAT, SAT, Integrated Systems Testing (IST), commissioning and final operational handover.
- Ensure redundancy, resilience and failover configurations meet project requirements.
Required profile
- Bachelor's degree in Civil, Mechanical or Electrical Engineering; Electrical or Mechanical preferred.
- 15-20 years of overall construction industry experience.
- Minimum 8-10 years of direct data center construction experience.
- Proven track record of personally delivering complete, operational data center projects.
- Experience working with main contractors or EPC contractors.
- GCC project experience is highly desirable.
- Candidates with purely IT infrastructure, data center operations or design-only backgrounds will not be considered.
Required skills
- Strong expertise in critical MEP infrastructure and mission-critical building services.
- Practical exposure to modular and prefabricated data center construction.
- Strong project leadership, commercial management, planning and execution capabilities.
Questions fréquentes
لماذا تبلغ عن هذا العرض؟
اكتشف المزيد
الرواتب والأدلة وعمليات البحث في الإمارات العربية المتحدة.
الرواتب حسب المهنة
قدم طلبك في 30 ثانية
أدخل بريدك الإلكتروني للتقديم. سيتم إنشاء حساب تلقائياً.
بالمتابعة، أنت توافق على شروط الاستخدام.
لديك حساب بالفعل؟ تسجيل الدخول
لديك سؤال حول هذا العرض؟
اطرحه هنا: ستصلك تفاصيل العرض كاملة عبر البريد الإلكتروني، فوراً.
عزز فرصك
حمّل سيرتك الذاتية وسنقترح عليك الوظائف التي تناسب ملفك.
جاري تحليل سيرتك الذاتية...
NAFFCO Careers
Doubaï
عروض عمل ذات صلة
-
Senior Associate, Construction Quantum
Secretariat Doubaï -
Civil Foreman - High-Rise Tower Project
Rakhat Construction Doubaï -
Procurement Engineer - Infrastructure & Road Construction (UAE)
STRABAG Doubaï -
Responsable Section Projets d'Investissement (Capital Projects)
Talents Tide Casablanca -
Directeur Associé – Livraison de Projets d'Infrastructure
Talents Tide Dubai