📢 New: get today's jobs on our WhatsApp Channel
Jobiglo

No results.

Project Quality Manager - Data Centre Construction

Jones Engineering · Dubai

New
Senior 🇬🇧 English
ISO-9001 QA/QC ITP NCR management Root cause analysis

Job description

About the role

Jones Engineering, an engineering services company with over 130 years of history covering mechanical, electrical, sprinkler and fire protection, waste-to-energy, lift specialist, off-site fabrication, BIM and geo-surveying, is looking for a Project Quality Manager in the UAE. You will lead the Quality Assurance and Quality Control function on large-scale data centre construction projects, ensuring compliance with contracts, specifications, standards and client expectations, and will gain exposure to mechanical, electrical and CSA disciplines.

Key responsibilities

  • Report to the Project Manager and to the Regional Quality Manager; develop and maintain the Project Quality Management Plan, procedures, ITPs and quality documentation
  • Set quality objectives, KPIs, inspection requirements and reporting processes
  • Lead Mechanical, Electrical and CSA QA/QC teams and coordinate with design, BIM, procurement and construction teams
  • Oversee material quality, including approvals, receiving inspections, traceability and storage
  • Plan and run audits of suppliers and off-site fabrication workshops, and oversee off-site fabrication quality (welding, inspection, testing, traceability)
  • Coordinate FATs for critical equipment and monitor construction quality, testing, commissioning and integrated systems testing
  • Manage NCRs, root cause analysis and corrective actions, and lead quality audits and site surveillance
  • Work with clients, consultants and third-party inspectors, and escalate major quality risks
  • Drive continuous improvement and ensure compliance with the group's QSPs

Required profile

  • Degree in Mechanical, Electrical or Civil Engineering
  • 10-15 years of overall construction experience, including at least 5 years in a senior QA/QC management position
  • Proven experience managing quality on large-scale data centre or mission-critical projects
  • Experience managing multidisciplinary QA/QC teams and subcontractor quality performance
  • Strong leadership, communication and problem-solving skills

Required skills

  • Knowledge of ISO-9001 quality management systems and construction quality practices
  • Developing Project Quality Plans, ITPs, method statements and quality procedures
  • NCR management, root cause analysis and corrective actions
  • Client/consultant coordination, quality audits and management reporting
  • Lead Auditor qualification (ISO 9001) preferred

What we offer

  • Competitive salary package commensurate with experience
  • Financial support for further training and CPD leading to chartered status
  • Performance incentives and career progression

Questions fréquentes

Le salaire n'est pas communiqué publiquement par le recruteur. Vous pouvez postuler et négocier directement avec Jones Engineering.
Cliquez sur "Postuler maintenant" en haut de la page. Vous pouvez importer votre CV en 1 clic — Jobiglo extrait automatiquement vos informations et postule pour vous.

Why are you reporting this job?

Thank you for your report. We will review this job.

Apply in 30 seconds

Enter your email to apply. An account will be created automatically.

Apply now →

By continuing, you accept our terms of use.

Already have an account? Login

A question about this job?

Ask it here: you will get the full job summary by e-mail, right away.

Published 3 hours ago

Expires 5 days from now

3 views · 0 interested

Boost your chances

Upload your CV — we will match you with relevant openings.

Analyzing your CV...

Jones Engineering

Dubai