📢 جديد: تابع عروض اليوم على قناتنا في واتساب
Jobiglo

لا توجد نتائج.

Managing & Senior Consultant – Delay Analysis

HKA · Abu Dhabi

Hybrid Senior 🇬🇧 English
Primavera P6 Time Impact Analysis Windows Analysis As-Planned vs As-Built assessments Forensic scheduling Project controls

وصف الوظيفة

About the role

HKA, a global consultancy specialising in risk mitigation and dispute resolution, is seeking experienced consultants to lead delay analysis services across a portfolio of construction, infrastructure, energy and engineering projects in the Middle East. You will work alongside senior experts to evaluate project performance, identify critical delay events and produce robust analyses for advisory and dispute resolution purposes.

Key responsibilities

  • Prepare and review delay analyses using recognised industry methodologies such as Time Impact Analysis and Windows Analysis.
  • Analyse project schedules, programme updates, progress records and related documentation to assess causes and impacts of delays.
  • Support the preparation of expert reports for arbitration, litigation and other dispute resolution proceedings.
  • Conduct programme reviews, schedule audits and project‑controls assessments, managing workstreams to ensure successful client engagements.
  • Build strong client relationships through high‑quality technical delivery and contribute to business development activities.

Required profile

  • Degree in Engineering, Construction Management, Project Management or a related discipline.
  • Significant experience on major construction, infrastructure, engineering or energy projects.
  • Strong expertise in Primavera P6 and managing or analysing complex project schedules.
  • Proven experience undertaking delay analysis, forensic planning or project‑controls assignments.
  • Knowledge of recognised delay‑analysis methodologies (Time Impact Analysis, Windows Analysis, As‑Planned vs As‑Built).
  • Excellent analytical, report‑writing and communication skills; professional body membership (e.g., AACE, CIOB, ICE) is desirable.

Required skills

  • Primavera P6
  • Time Impact Analysis
  • Windows Analysis
  • As‑Planned vs As‑Built assessments
  • Forensic scheduling
  • Project controls

What we offer

  • Hybrid working environment combining on‑site and remote collaboration.
  • Inclusive and collaborative culture with strong focus on professional development and mentoring.
  • Opportunities to work on high‑profile, complex projects and disputes across the region.

Questions fréquentes

Le salaire n'est pas communiqué publiquement par le recruteur. Vous pouvez postuler et négocier directement avec HKA.
Cliquez sur "Postuler maintenant" en haut de la page. Vous pouvez importer votre CV en 1 clic — Jobiglo extrait automatiquement vos informations et postule pour vous.

لماذا تبلغ عن هذا العرض؟

شكراً لإبلاغك. سنراجع هذا العرض.

اكتشف المزيد

الرواتب والأدلة وعمليات البحث في الإمارات العربية المتحدة.

قدم طلبك في 30 ثانية

أدخل بريدك الإلكتروني للتقديم. سيتم إنشاء حساب تلقائياً.

بالمتابعة، أنت توافق على شروط الاستخدام.

لديك حساب بالفعل؟ تسجيل الدخول

لديك سؤال حول هذا العرض؟

اطرحه هنا: ستصلك تفاصيل العرض كاملة عبر البريد الإلكتروني، فوراً.

💬 راسلنا على تيليجرام

منشور منذ أسبوع

ينتهي 4 أيام من الآن

26 مشاهدات · 0 مهتم

عزز فرصك

حمّل سيرتك الذاتية وسنقترح عليك الوظائف التي تناسب ملفك.

جاري تحليل سيرتك الذاتية...

HKA

Abu Dhabi